Home About Us Companies News Gallery Contact Us
 :: Real Estate Development & Construction Co.
 
RAKA Saudi Power and Water Co. was established in 2003 to provide comprehensive services for complete projects delivery, specialized in power generation, power distribution, seawater desalination, wastewater treatment and all related activities.
RAKA has entered into joint venture agreements (listed below) with selective leading international and local engineering, supplier, manufacturing and construction companies(related to the above listed services). Our aim is: to respond to clients’ expectation, to provide them with paramount service, andto achieve the most beneficial results.
RAKA dedicates itself to finding and developing qualified professionals for providing creative, cost sensitive solutions in ever changing environment.

WATER & POWER CORE COMPETENCIES
  • Cost and Technical Excellence
    • Worldwide reach to technical excellence, products and
      services.
    • Understanding and experience to match the client needs and expectation.
       
  • Key Benefits
    • RAKA network of local and international partners combines technical excellence, cost sensitive and experience to provide quality product and service to achieve client goals.
    • Our staff on the average have over 20 years experience in design, construction and Operation of large scale projects, including, state of the art semiconductor manufacturing facilities, Flat Panel Manufacturing Facilities, Data Centers, Power Generating Stations and Electrical Substations.
    • 20 years of International experience and products qualification.
    • Joint Venture with Major suppliers and manufactures of power products in North America, Europe and Asia.
    • Representative of excellent engineering and construction company world wide, to tap for the right resources.
    • Up to date in the latest trend in the Power Industry, Power Generation, Power Distribution/Transmission, Water Services, Wastewater, and all related codes and regulations.
       
  • Service & Scope
    • Programming
    • Mechanical Engineering
    • Feasibility
    • Electrical Engineering
    • Master planning
    • Telecommunications
    • Regulatory
    • Estimating, Cost and Scheduling
    • Environmental
    • Procurement Expedition
    • Architectural Design
    • Facility Maintenance and Operation
    • Civil Engineering
    • Training
    • Structural Engineering
    • Supplying and Installing


       
  • Power Sector
    •  The electrical stations.
    • The electrical equipments of high and medium frequency.
    • The electrical generators.
    • Supply and maintaining transformers, electric boards, and electric stations.

       
  • Water Sector
    • Desalination stations of reversal maturity.
    • Multi phase evaporation.
    • Flash evaporation.
    • Projects for water treatment & purification as well as sewage system.
    • Operation and maintenance of water desalination stations.
    • Equipment of irrigation, well drilling, extending ducts, & distributing water.

       
  • MINIMUM PROCUREMENT STANDARDS
    • All project requirements meet the Operational Program
    • Environmental Health and Safety
    • Quality and performance requirements will be met
    • Warranty of Materials, labor and Workmanship
    • Interface coordination and sequencing is clearly understood
    • Cost control measures are taken to minimize additions or changes
    • Pre-approval of Supplier and Vendors
    • Schedule Adherence
    • Incidental costs are included
       
  • WARRANTY STANDARDS
    • Materials and equipment furnished will be of specified
      quality.
    • Work will be free from defects and will conform to the requirements of the Contract Documents.
    • Work not conforming to these requirements, including substitutions not properly approved an authorized, will be considered defective.
    • The warranty period shall be for a minimum of 12 months from Date of Completion of the Work.
       
  • CRITICAL SUCCESS CRITERIA
    • Minimal Capital Cost
    • No Compromise on Quality
    • Attain Target Completion Date
    • Maximum Operating Profit Margin
    • Maintain Expansion Options with Modular Approach
    • General Project Guidelines & Assumptions
    • All parties live up to their responsibilities
    • Good communication
    • Timely response
    • Timely deliverable
       
  • GENERAL PROJECT GUIDELINES & ASSUMPTIONS
    • All parties live up to their responsibilities
    • Good communication
    • Timely response
    • Timely deliverable
       
  • VISION STATEMENT
    • Experience and hard work
    • Business Ethics
    • Accept Responsibility
       
  • PRIORITIES
    • Quality and efficiency Up
    • Capital Cost Down
    • Operating Cost Down
       
  • WHY RAKA? DESIGN/BUILD
    • RAKA has extensive partnerships and has processed a long list of vendor/ supplier qualifications that help all our clients with cost control, quality and timely completion of the new or renovation projects.
    • The depth of talent and the rounded experience is an assurance that our project completion and success is guaranteed.
    • RAKA pride itself to go above the call of duties to ensure any undertaken project is successfully completed.
    • Our High Ethics and Flexibility are a major factor in EWS-RAKA’s Operations.

       
  • CONSTRUCTION PHASE
    • Supervision
    • Equipment  : Rental + Purchase
    • Subcontractors :  Pre-bid + Review / Negotiation + Coordination + Performance
    • Environmental, Health and Safety
    • Field Control the Project
    • Regular Meetings
    • Monitoring and Reporting

       
  • SCHEDULE
    • Client provides vision from which RAKA establishes project goals.
    • RAKA develops an integrated projects schedule that demonstrates feasibility of clients vision.
    • This schedule will provide the basis for the project milestones which will show when project goals will be
      accomplished.
    • Contractors provide detailed schedules based on the project milestones that demonstrate their ability to achieve specified project goals.
  • Suppliers Representative
    • Generators All sizes
    • HV Switchgears all types/sizes
    • MV Switchgears all types/sizes
    • Power Transformers
    • Distribution Transformers
    • Protection relays, Metering Monitoring, and Instrumentation.
    • Low Voltage Distribution Equipment
    • SCADA
    • Motor Control CenterStarters
    • Control Panel
    • Construction Materials
    • Telecommunication Equipment
    • Lighting Fixtures
    • High Performance Energy Saving Lighting Fixtures
    • Water Treatment Packages up to multi million GPD
    • Cables/Transmission systems

       
  • Established Joint Venture Agreements
    • Official Agreement/ Joint Venture
      • Fortune Electric (Med/High Volt Manufacturing/ EPC)
      • Pact Pacific(Water treatment)
      • Nan Ya (Med/High Voltage Manufacturer)
      • General Electric (Electrical Products)
      • Cummins (Generators)
      • The Lighting Edge, Inc (manufacturer)
      • ECI (T&D)
      • The Keith Co. (Power EPC)
      • NEIE (Electric Power Construction Ent.
      • Shanghai ZheZhong Group Co.,
      • Aster (Water and Power Generation)
      • YK Engineering Co. (I&C)
      • EDC ( Eng. Design)
      • Third Enterprise Co. Manufacture)
      • Ampower (Gen & Control)
      • Solomon (Gen & Control)
      • AEC Professionals. Inc. (Eng)
      • West Cost Security
      • ZTR ENESTA Austria (Xfr Manufacturing)
    • Indirect Joint Venture Agreements
      • Square D F ABB
      • Kholer, Himoinsa, Tor
      • Alstom
      • Mitsubishi
      • Hitachi
         

SUBSIDIARIES

  • RAKA TURBINE

    RAKA Turbine Co. Ltd. founded in 1996 that provides New, Refurbished Turbines of all types and sizes, Turn Key Repair and Restoration of Industrial and Gas Turbines spare parts-supported by high technology to the gas and steam turbine centers, compressors, generators, and engines.
    The scope of its function is to design, supply, and install the following:
    • Repair the hot parts of the gas and steam turbines.
    • Maintaining, operating the turbines and the generation & transferring electricity stations.
    • Testing and investigating the damages of turbines.
    • Supply and install the turbines and the electric generations.
    • Supply and install the reserved Electric system.
    • Supply spare parts of the turbines & control equipments.
    • Supply the augmented materials to the turbine fuel.
    • Supply all electrical & mechanical equipments of the turbines.
    • Supply the electrical power transformers.
    • The contracts of the electrical and mechanical works mechanical works.

    Company’s Customers

    • Saudi Electricity Company / Central Operating Area
    • Naseriyah Electricity
    • Military Works (Ministry of Defense)
    • Ministry of Interior ( Civil Defense)
    • Ministry of Electricity and Water (Kingdom of Bahrain)
    • American’s Headquarter (Salmia Military Base)
    • King Abdulaziz University of Science & Technology
    • King Abdulaziz Military City
    • King Khalid Military City
    • King Faisal Military City
    • King Abdul-Aziz Port (Jeddah)
       
 
 
   
                  
Copy Rights Raka Holding Company 2007, All Rights are Reserved

Developed by Marfaa Media