|
|
|
|
| |
 |
|
 |
 |
|
|
|
|
|
:: Real
Estate Development &
Construction Co. |
|
|
 |
RAKA Saudi Power and
Water Co. was
established in 2003 to
provide comprehensive
services for complete
projects delivery,
specialized in power
generation, power
distribution, seawater
desalination, wastewater
treatment and all
related activities.
RAKA has entered into
joint venture agreements
(listed below) with
selective leading
international and local
engineering, supplier,
manufacturing and
construction
companies(related to the
above listed services).
Our aim is: to respond
to clients’ expectation,
to provide them with
paramount service, andto
achieve the most
beneficial results.
RAKA dedicates itself to
finding and developing
qualified professionals
for providing creative,
cost sensitive solutions
in ever changing
environment.
WATER & POWER CORE
COMPETENCIES
- Cost and
Technical Excellence
- Worldwide
reach to
technical
excellence,
products and
services.
-
Understanding
and experience
to match the
client needs and
expectation.
- Key Benefits
- RAKA network
of local and
international
partners
combines
technical
excellence, cost
sensitive and
experience to
provide quality
product and
service to
achieve client
goals.
- Our staff on
the average have
over 20 years
experience in
design,
construction and
Operation of
large scale
projects,
including, state
of the art
semiconductor
manufacturing
facilities, Flat
Panel
Manufacturing
Facilities, Data
Centers, Power
Generating
Stations and
Electrical
Substations.
- 20 years of
International
experience and
products
qualification.
- Joint
Venture with
Major suppliers
and manufactures
of power
products in
North America,
Europe and Asia.
-
Representative
of excellent
engineering and
construction
company world
wide, to tap for
the right
resources.
- Up to date
in the latest
trend in the
Power Industry,
Power
Generation,
Power
Distribution/Transmission,
Water Services,
Wastewater, and
all related
codes and
regulations.
- Service & Scope
- Programming
- Mechanical
Engineering
- Feasibility
- Electrical
Engineering
- Master
planning
-
Telecommunications
- Regulatory
- Estimating,
Cost and
Scheduling
-
Environmental
- Procurement
Expedition
-
Architectural
Design
- Facility
Maintenance and
Operation
- Civil
Engineering
- Training
- Structural
Engineering
- Supplying
and Installing
- Power Sector
- The
electrical
stations.
- The
electrical
equipments of
high and medium
frequency.
- The
electrical
generators.
- Supply and
maintaining
transformers,
electric boards,
and electric
stations.
- Water Sector
- Desalination
stations of
reversal
maturity.
- Multi phase
evaporation.
- Flash
evaporation.
- Projects for
water treatment
& purification
as well as
sewage system.
- Operation
and maintenance
of water
desalination
stations.
- Equipment of
irrigation, well
drilling,
extending ducts,
& distributing
water.
- MINIMUM
PROCUREMENT
STANDARDS
- All project
requirements
meet the
Operational
Program
-
Environmental
Health and
Safety
- Quality and
performance
requirements
will be met
- Warranty of
Materials, labor
and Workmanship
- Interface
coordination and
sequencing is
clearly
understood
- Cost control
measures are
taken to
minimize
additions or
changes
- Pre-approval
of Supplier and
Vendors
- Schedule
Adherence
- Incidental
costs are
included
- WARRANTY
STANDARDS
- Materials
and equipment
furnished will
be of specified
quality.
- Work will be
free from
defects and will
conform to the
requirements of
the Contract
Documents.
- Work not
conforming to
these
requirements,
including
substitutions
not properly
approved an
authorized, will
be considered
defective.
- The warranty
period shall be
for a minimum of
12 months from
Date of
Completion of
the Work.
- CRITICAL SUCCESS
CRITERIA
- Minimal
Capital Cost
- No
Compromise on
Quality
- Attain
Target
Completion Date
- Maximum
Operating Profit
Margin
- Maintain
Expansion
Options with
Modular Approach
- General
Project
Guidelines &
Assumptions
- All parties
live up to their
responsibilities
- Good
communication
- Timely
response
- Timely
deliverable
- GENERAL PROJECT
GUIDELINES &
ASSUMPTIONS
- All parties
live up to their
responsibilities
- Good
communication
- Timely
response
- Timely
deliverable
- VISION STATEMENT
- Experience
and hard work
- Business
Ethics
- Accept
Responsibility
- PRIORITIES
- Quality and
efficiency Up
- Capital Cost
Down
- Operating
Cost Down
- WHY RAKA?
DESIGN/BUILD
- RAKA has
extensive
partnerships and
has processed a
long list of
vendor/ supplier
qualifications
that help all
our clients with
cost control,
quality and
timely
completion of
the new or
renovation
projects.
- The depth of
talent and the
rounded
experience is an
assurance that
our project
completion and
success is
guaranteed.
- RAKA pride
itself to go
above the call
of duties to
ensure any
undertaken
project is
successfully
completed.
- Our High
Ethics and
Flexibility are
a major factor
in EWS-RAKA’s
Operations.
- CONSTRUCTION
PHASE
- Supervision
- Equipment
: Rental +
Purchase
-
Subcontractors :
Pre-bid + Review
/ Negotiation +
Coordination +
Performance
-
Environmental,
Health and
Safety
- Field
Control the
Project
- Regular
Meetings
- Monitoring
and Reporting
- SCHEDULE
- Client
provides vision
from which RAKA
establishes
project goals.
- RAKA
develops an
integrated
projects
schedule that
demonstrates
feasibility of
clients vision.
- This
schedule will
provide the
basis for the
project
milestones which
will show when
project goals
will be
accomplished.
- Contractors
provide detailed
schedules based
on the project
milestones that
demonstrate
their ability to
achieve
specified
project goals.
- Suppliers
Representative
- Generators
All sizes
- HV
Switchgears all
types/sizes
- MV
Switchgears all
types/sizes
- Power
Transformers
- Distribution
Transformers
- Protection
relays, Metering
Monitoring, and
Instrumentation.
- Low Voltage
Distribution
Equipment
- SCADA
- Motor
Control
CenterStarters
- Control
Panel
- Construction
Materials
-
Telecommunication
Equipment
- Lighting
Fixtures
- High
Performance
Energy Saving
Lighting
Fixtures
- Water
Treatment
Packages up to
multi million
GPD
-
Cables/Transmission
systems
- Established
Joint Venture
Agreements
- Official
Agreement/ Joint
Venture
- Fortune
Electric
(Med/High
Volt
Manufacturing/
EPC)
- Pact
Pacific(Water
treatment)
- Nan Ya
(Med/High
Voltage
Manufacturer)
- General
Electric
(Electrical
Products)
- Cummins
(Generators)
- The
Lighting
Edge, Inc
(manufacturer)
- ECI
(T&D)
- The
Keith Co.
(Power EPC)
- NEIE
(Electric
Power
Construction
Ent.
- Shanghai
ZheZhong
Group Co.,
- Aster
(Water and
Power
Generation)
- YK
Engineering
Co. (I&C)
- EDC (
Eng. Design)
- Third
Enterprise
Co.
Manufacture)
- Ampower
(Gen &
Control)
- Solomon
(Gen &
Control)
- AEC
Professionals.
Inc. (Eng)
- West
Cost
Security
- ZTR
ENESTA
Austria (Xfr
Manufacturing)
- Indirect
Joint Venture
Agreements
- Square D
F ABB
- Kholer,
Himoinsa,
Tor
- Alstom
-
Mitsubishi
- Hitachi
SUBSIDIARIES
- RAKA TURBINE
RAKA Turbine Co.
Ltd. founded in 1996
that provides New,
Refurbished Turbines
of all types and
sizes, Turn Key
Repair and
Restoration of
Industrial and Gas
Turbines spare
parts-supported by
high technology to
the gas and steam
turbine centers,
compressors,
generators, and
engines.
The scope of its
function is to
design, supply, and
install the
following:
- Repair the
hot parts of the
gas and steam
turbines.
- Maintaining,
operating the
turbines and the
generation &
transferring
electricity
stations.
- Testing and
investigating
the damages of
turbines.
- Supply and
install the
turbines and the
electric
generations.
- Supply and
install the
reserved
Electric system.
- Supply spare
parts of the
turbines &
control
equipments.
- Supply the
augmented
materials to the
turbine fuel.
- Supply all
electrical &
mechanical
equipments of
the turbines.
- Supply the
electrical power
transformers.
- The
contracts of the
electrical and
mechanical works
mechanical
works.
Company’s
Customers
- Saudi
Electricity
Company /
Central
Operating Area
- Naseriyah
Electricity
- Military
Works (Ministry
of Defense)
- Ministry of
Interior ( Civil
Defense)
- Ministry of
Electricity and
Water (Kingdom
of Bahrain)
- American’s
Headquarter (Salmia
Military Base)
- King
Abdulaziz
University of
Science &
Technology
- King
Abdulaziz
Military City
- King Khalid
Military City
- King Faisal
Military City
- King Abdul-Aziz
Port (Jeddah)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|